Interactive demo You are viewing a sample team health dashboard for Acme Engineering, a fictional company. All names and numbers are sample data. Connected to your Jira and GitHub, Steer builds the scores, the rollup and the recommendations from your own teams, and posts a weekly Slack digest. Drafted messages, email reports and calendar sync are coming soon. About Steer →
Briefing Dashboard

Steer

Powered by your operating model
Acme Engineering
Q2 2026 · Sprint 4 of 6 · 42 engineers · 5 teams
JIRA: connected · GitHub: connected
Team Detail
Leadership Rollup
Notifications
How It Works
Acme Engineering · Q2 2026 · Sprint 4 of 6
Org Health At Risk 70%
3 Healthy · 1 At Risk · 1 Critical · ↓ vs. Q1
7 open issues
3 in progress · 2 stale (>14d)
Hide deep-dive sections, show only this week's decisions and the upcoming sync

This Week's Leadership Focus

Four decisions that need your attention this week.

📋 Next Leadership Sync · Meeting Notes

Friday, May 1 · 10:00–11:00 AM · Conference Room "Crater" + Zoom
Attendees: VP Engineering · Maya Krishnan (Director, Platform) · Lisa Park (Director, Product Eng) · 5 Tech Leads
📅 Google Calendar · synced 📧 Agenda email · Thu 5:00 PM 💬 Slack #leadership-sync · 1h before 🎫 JIRA action-item sync · on
—
Last sync (April 24): 4 items discussed · 2 resulted in action items · View previous sync notes → Click any item below to expand notes

📜 Recent Activity

Audit trail of status changes and decisions across the org.
Show full health view → (Cross-team matrix and issue pipeline)

Cross-Team Health, Q2 2026

Five-team status matrix with quarter-over-quarter trends. The summary at the top shows how many teams sit in each status per category, useful for spotting cross-cutting patterns (e.g., 0 teams Healthy on a category usually means a structural issue).

Team Overall Planning Delivery Quality Execution Team Health AI Leverage
Trend sparklines show 4-quarter movement (Q3 '25 → Q4 '25 → Q1 '26 → Q2 '26). Click any team row to drill into its detail view.
Two questions I ask every engineering leader:

Cross-Team Issue List · Status Pipeline

Every Critical and At Risk signal across all teams, grouped by progress status. Click any pill to filter, this answers "where did the items I marked Planned go?" Issues drop off the list automatically when the signal returns to Healthy or is dismissed. Stale items (open >14 days with no progress) are flagged in red.

—
Team Signal Value Severity Owner Progress Days Open Action

Push-Based Insight Delivery

Steer pushes insights to where engineering leaders already work. No need to log into another dashboard, the dashboard comes to you.

# Slack · #engineering-leadership · Monday 9:00 AM
Steer · Weekly Digest
Org Health: At Risk 70%
🔴 Team Delta ·Critical across all categories
CRR 58% · Cognitive Load 62% · 3 AI recommendations
🟡 Team Beta ·Planning Health dropped to Critical (was At Risk)
Backlog readiness dropped to 1.5 sprints · 2 AI recommendations
🟢 Team Gamma ·All Healthy (90%)
🟢 Team Alpha ·Healthy (80%)
🟢 Team Epsilon ·Healthy (80%)
On the roadmap: JIRA dashboard gadgets (drop signals into your existing JIRA dashboards) · Microsoft Teams digest · Webhook payloads for custom routing.

From Operating-Model Install to First Dashboard

The product is three phases. First, adopt the operating model: the template bundle gives you the 16-section Confluence space and the exact Jira configuration to apply, so you are not designing it from scratch. Then move your teams onto it at each team's pace, typically one or two sprints. Greenfield orgs skip that step. Then connect Steer. It reads the structure you already work in, calculates the signals, and prescribes the fix when one slips.

1
Phase 1 · One time · Free

Adopt the operating model

The template bundle installs the 16-section Confluence space directly. For Jira it gives you the prescribed hierarchy (Strategy → Initiative → Epic → Story), the custom fields, the dashboards and the JQL filters as a configuration your admin applies. Steer never needs to own your Jira, and it never creates projects behind your back.
✓ 16-section Confluence space, installed
✓ Jira hierarchy + custom fields, applied by your admin
✓ Pre-built dashboards + JQL filters
✓ Setup guides for the JPD board and the automation rules
✓ Standard-tier fallback if you're not on Premium
✓ Already have your own structure? Steer maps to it instead
2
Phase 2 · 1–2 sprints · Self-serve

Migrate your teams to the operating model

If you already run Jira, your existing structure won't match the prescribed one. Work through the migration playbook (ships with the template) at each team's pace. Greenfield orgs skip this phase entirely.
✓ Map existing Jira projects to teams
✓ Re-parent work into Strategy → Initiative → Epic → Story
✓ Populate prescribed custom fields
✓ Adopt the QP + sprint cadence
✓ Backlog grooming + dependency-tagging pass
✓ Migration playbook + checklist in your Confluence
Phase 3 · Connect the SaaS · ~25 minutes
1

Sign Up

Create an account with your work email. Your company gets its own workspace from day one.
Sign up with email
2

Connect JIRA

OAuth 2.0 flow. We request read-only scopes, sprints, issues, projects, boards. Nothing else.
Atlassian, Authorize
✓ Read your JIRA projects
✓ Read your sprints and issues
✓ Read your boards
✗ No write access
Accept
3

Connect GitHub

Install the GitHub App. Pick which repos to share, granular permissions, revocable any time.
GitHub App · Install
✓ Pull requests (read)
✓ Deployments (read)
✓ Commit metadata (read)
Select repositories: 5 selected
Install
4

Map Teams

Auto-detect JIRA boards and GitHub teams. Confirm the mapping. Adjust if needed.
Team Alpha → JIRA: ALPHA · GH: core-platform
Team Beta → JIRA: BETA · GH: customer-features
Team Gamma → JIRA: MOBILE · GH: mobile-app
+ 2 more auto-detected
5

Context Questions

Tell us about your operating context. We use this to filter recommendations to what's actually applicable.
• Methodology: Scrum
• Sprint cadence: 2 weeks
• Org size: 42 engineers
• Maturity: Established
• Use Quarterly Planning? Yes
6

First Dashboard

"Your data is syncing..." then the board populates. The signals Jira and GitHub can answer calculate themselves. Any signal that cannot be rated yet says why, and what will rate it.
Syncing complete
10 signals calculated · 8 ready for your input · 12 on the roadmap
Privacy note: We never send raw issue descriptions, comments, or PII to the LLM. Recommendations use anonymized signal values plus the operating model knowledge base. See our security posture for the full data-handling policy.